Military Access, Mobility & Safety Improvement Program Updates for Week of November 5


Colorado Springs —­­ There will be southbound I-25 alternating left and right lane closures on Monday, November 6, 7 p.m. to 6 a.m., near South Academy Boulevard and also between Santa Fe Ave and Ray Nixon Road (mile point 127), for patching of the roadway.

Also, Bandley Road will be reduced to one lane of alternating north- and southbound traffic on Tuesday, November 7, 7 a.m. to 5 p.m., controlled by flaggers between mile points 129 to 130 to install embankment protection. In case of weather impacts, a contingency day has been scheduled for Wednesday, November 8.

El Paso County – MAMSIP – South Academy Boulevard Widening Project

On Tuesday and Wednesday, 7 p.m. to 4:30 a.m., there will be an alternating double lane closure on northbound South Academy Boulevard west of Fountain Creek to allow crews to stripe lanes for traffic switch and place temporary barrier.

Also, on Wednesday, 7 p.m. to 4:30 a.m., the left two lanes of northbound South Academy Boulevard near Fountain Creek will be closed to allow crews to place temporary barrier.

Starting Thursday, drivers can anticipate a traffic shift to the outside lanes of northbound and southbound South Academy Boulevard to allow crews to start on drainage work in the median.

A left lane closure is ongoing for northbound and southbound South Academy Boulevard over Bradley Road to allow crews to perform bridge work. This left lane closure will be in place for approximately five months.

There will also be an ongoing auxiliary lane closure on northbound South Academy Boulevard between Hartford Street and Fountain Creek through mid-December for drainage line and utility work.

All lanes of Bradley Road under South Academy Boulevard will be shifted to the north side of the roadway Sunday and Monday, then relocated to the south side starting Tuesday ongoing to allow crews to perform drilling for new caisson construction.

These closures are weather dependent and subject to change.

Traffic Impacts

Night work on I-25 between US 85/Fountain (mile 128) and South Academy Boulevard (mile 135)

  • Monday, November 6, 7 p.m. to 6 a.m.
    • Alternating lane closures of southbound I-25 near South Academy Boulevard
    • Alternating lane closures of southbound I-25 near mile point 127

Day work on Bandley Road (mile 129 to 130)

  • Tuesday, November 7, 7 a.m. to 5 p.m.
    • One lane of alternating traffic controlled by flaggers
  • Wednesday, November 8, 7 a.m. to 5 p.m. (contingency)
    • One lane of alternating traffic controlled by flaggers

South Academy Boulevard Widening Project

  • Tuesday, November 7 and Wednesday, November 8, 7 p.m. to 4:30 a.m.
    • Alternating double lane closure on northbound South Academy Boulevard
  • Wednesday, November 8, 7 p.m. to 4:30 a.m.
    • Double left lane closure on northbound South Academy Boulevard
  • Ongoing northbound and southbound left lane closure at South Academy Boulevard over Bradley Road, in place for approximately five months
  • Ongoing northbound auxiliary lane closure on South Academy Boulevard between Hartford Street and Fountain Creek. This auxiliary lane will be closed through mid-December
  • Ongoing shift of all lanes on Bradley Road to north side (Sunday and Monday) and south side (Tuesday and ongoing) of roadway under South Academy Boulevard bridge
  • Ongoing closure of the Fountain Creek Regional Trail under South Academy Boulevard

Project Overview

Interstate-25 – Safety and Efficiency Improvements
The improvements to I-25 addressed in this project are located along an approximately 7.5-mile segment of south I-25 beginning at South Academy Boulevard and extending to the Santa Fe Avenue (U.S. 85/87) exit at Fountain (MP 128), which exits to Gate 19 of Fort Carson. The project includes:

  • Replacement of two bridges crossing over South Academy Boulevard
  • Widening of both inside and outside shoulders and installing safety improvements
  • Concrete surface treatment overlay to provide an improved riding surface
  • Installation of median barrier
  • Rehab and widening work on four bridges
  • Installation of an I-25 southbound deceleration lane at the interchange with CO 16

South Academy Boulevard Widening Project

The improvements to South Academy Boulevard in this project are located on South Academy Boulevard at the southern mile and a half of this arterial road from the I-25 interchange, crossing U.S. Highway 85/ 87, and continuing to the road’s approach to Milton Proby Parkway (which connects to Powers Boulevard/CO 21). Construction focuses on widening an approximately 1.5-mile section of South Academy Boulevard from two lanes to three in each direction to alleviate recurring congestion. The project includes improved drainage facilities, lighting, striping, and expanded shoulders, modified merge lanes, sound walls and bridgework. The project is expected to be complete by early 2026. This project is managed by El Paso County.

Safety Benefits

CDOT conducted a safety assessment for the corridor to evaluate the magnitude and nature of safety problems and analyze the causes of crashes. These transportation improvements are mitigation measures to reduce crashes, improve infrastructure, and address physical deficiencies that contribute to crashes in the corridor. Over the next 20 years, the project is estimated to result in fewer deaths, injuries and crashes on the four MAMSIP corridors.

Project Contact Information

About the Military Access, Mobility & Safety Improvement Program Build Grant

Colorado Department of Transportation (CDOT) has initiated a program to deliver more efficient and safer mobility along I-25, Colorado Highway 94, South Academy Boulevard, and Charter Oak Ranch Road, enabling economic stability and development. The Military Access, Mobility & Safety Improvement Program is partially funded through an $18 million BUILD grant award from the US Department of Transportation. The delivery of these improvements will strengthen and enhance the redundancy of strategic movement between the nationally significant El Paso County military installations of Fort Carson, Peterson Space Force Base, Cheyenne Mountain Space Force Station, and Schriever Space Force Base.

Know Before You Go

Travelers are urged to “know before you go.” Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road. CDOT resources include:

Remember: Slow For The Cone Zone

The following tips are to help you stay safe while traveling through maintenance and construction work zones.

  • Do not speed in work zones. Obey the posted speed limits.
  • Stay Alert! Expect the unexpected.
  • Watch for workers. Drive with caution.
  • Don’t change lanes unnecessarily.
  • Avoid using mobile devices such as phones while driving in work zones.
  • Turn on headlights so that workers and other drivers can see you.
  • Be especially alert at night while driving in work zones.
  • Expect delays, especially during peak travel times.
  • Allow ample space between you and the car in front of you.
  • Anticipate lane shifts and merge when directed to do so.
  • Be patient!

Download the COtrip App!

The new FREE COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!


Leave a Reply

Your email address will not be published. Required fields are marked *